Sweetwater Data Center Overview
Sweetwater
2,000
MW

Total Capacity

1,800
Acres

Total Land Area

Sweetwater TX, USA

IREN’s 2GW Sweetwater Hub is strategically located in West Texas across two sites: Sweetwater 1 and Sweetwater 2. Spanning 1,800 acres, together the two sites are capable of supporting over 700,000 state-of-the-art liquid-cooled GPUs.

Sweetwater Data Centers

With direct connection to the ERCOT grid, both Sweetwater 1 and Sweetwater 2 feature multiple fiber paths, delivering <10ms latency to the nearest hyperscaler regions. Procurement and site works are underway to support the energization of the 1,400MW bulk substation (345kV/138kV) as well as primary substations (138kV/34.5kV) at Sweetwater 1.

SWEETWATER TX, USA
Air + Liquid Cooling

Sweetwater 1

2026 Energization

UNDER CONSTRUCTION

Power Capacity1,400MW
Land1,300Acres
SWEETWATER TX, USA
Air + Liquid Cooling

Sweetwater 2

2027 Energization

UNDER CONSTRUCTION

Power Capacity600MW
Land500Acres